Thanks to Friend’s of Pathways for this IMPRESSIVE updates on Game Creek, North Pathway 89, and Path22!
|
||
|
Not sure where to go ride your fat bike? Never fear - we’ve got the low down on all the fat biking in Teton Valley and Jackson Hole! Before you go click here for some rules of the trails!
Teton Valley Favorites:
Grand Targhee Resort: Yup, you can ride on sweet groomed nordic track at a resort! Just head up to Grand Targhee Resort.
Greater Snow King Area/Munger Mountain Area/Teton Pass Area
Last week the FS crew worked on the middle fork of Ditch Creek, clearing and improving washed out sections of trail.
Trail Report, August 23rd, 2011
Greater Snow King Area/Munger Mountain Area/Teton Pass Area
The Silver Star work on Teton Pass continues to progress: they are already below Crater Lake and moving down Old Pass Road. Heavy equipment remains on Old Pass Road during this project. To ensure public safety, temporary trail closures will be in place where machinery is working. To read the entire press release, click here.
Below you will find today’s trails and pathways report for Jackson Hole. Friends of Pathways and the Forest Service have trail crews out on the systems daily, working hard on trail maintenance and construction. Friends of Pathways also works with Jackson Hole Community Pathways and Teton County Parks and Recreation to ensure pathways are swept and safe.
Trail Report, August 1oth, 2011
Greater Snow King Area/Munger Mountain Area/Teton Pass Area
Last week the FS crew worked with a Wilderness Ventures group clearing the Dog Creek to Little Dog Creek loop.
The FOP crew worked on completing two new sections of trail: one at the bottom of Phillips Ridge, with the help of several volunteer groups, and the other a connector trail from the Pine Glades development to Sink or Swim, which trail crews are hoping to call the “Shade Monkey Trail.” This trail was made with a mini excavator that narrowed down to 3 feet wide, providing 2,244’ of shaded single track. Both of these new sections should be finished this week.
The TFR crew has finished some work on the upper Fuzzy Bunny trail including some new road gap jumps.
Crews and volunteers are working hard daily, addressing problem areas first and then moving to trail improvements as needed. Please be patient, send in your observations, and come out and help - Friday AM’s have now moved to the Teton Pass Area (meet at the Stagecoach at 8am).
Possible Old Pass Road Closures
Silver Star Communications began work this week to install fiber optic cable along the Old Pass Road. This work is park of a larger project to install approximately 100 miles of high-speed fiber optic cable to improve connectivity of broadband service across Wyoming. The work along Old Pass Road will help complete a key loop for this project. Heavy equipment will be on Old Pass Road during the project, which is expected to take about two weeks. To ensure public safety, temporary trail closures will be in place where machinery is working. To read the entire press release, click here.
Pathways Report, August 10th, 2011
Pathways should be open to use during the asphalt patching work, but users should follow instructions from work crews and pay attention to regulatory warning signs. During the sealcoating work, sections of pathway will be closed temporarily.
County Begins Work on South Park Loop Bridges, Road Closure near Melody Ranch
On August 15th, Teton County will begin construction work to replace the existing South Park Loop Road Bridge over Flat Creek near Melody Ranch. This project will require closure of the South Park Loop Road in the vicinity of Melody Ranch for the entire 4-month construction period. Concurrent with the road bridge project, the County will also begin construction of a new pathway bridge over Flat Creek adjacent to South Park Loop Road. The bridges will be operational and South Park Loop Road will re-open by mid-December. To read the complete press release, click here.
Below you will find today’s trails and pathways report for Jackson Hole. Friends of Pathways and the Forest Service have trail crews out on the systems daily, working hard on trail maintenance and construction. Friends of Pathways also works with Jackson Hole Community Pathways and Teton County Parks and Recreation to ensure pathways are swept and safe.
Trail Report, July 20, 2011
Greater Snow King Area/Munger Mountain Area/Teton Pass Area
Arrow to Phillips is rideable and 99% snow free, but do be aware of the trench near the creek crossing at the bottom where the high water caused damage. Blacks is now snow free; the Ridge Trail is riding well as are the lower downhill trails. The Jumps Trail reroute is finished and the Teton Freedom Riders - as part of the JH Trails Project - are working on the bottom part of the Fuzzy Bunny Trail, which is closed halfway down during construction.
Trails Projects, Summer 2011:
Pathways Report, July 20, 2011
Pathways will be installing a “pathway travel lane” for users on the North 89 pathway south of the Fish Hatchery Road. There is an unfinished section of pathway just south of the Fish Hatchery, and pathway users are required to use the highway shoulder between the completed sections. Traffic delineators will be placed on the shoulder to separate pathway users from motor vehicles. The “travel lane” will be in place until the pathway is completed later this summer.
Please let us know if there are any concerns or questions about maintenance and safety conditions on pathways and trails at stewardship@friendsofpathways.org, or call 733-4534.
Below you will find today’s trails and pathways report for Jackson Hole. Friends of Pathways and the Forest Service have trail crews out on the systems daily, working hard on trail maintenance and construction. Friends of Pathways also works with Jackson Hole Community Pathways and Teton County Parks and Recreation to ensure pathways are swept and safe.
Trail Report, July 6, 2011
Greater Snow King Area/Munger Mountain Area/Teton Pass Area
Last week Friends of Pathways’ crews fixed several problem areas in Game Creek, moving the tread higher where the beaver pond had risen, and building a bridge to replace the flooded crossing just below the West Game junction. The Forest Service crew was off last week (they work 8 days on and 6 days off).
Friday Morning Volunteer Days in Cache Creek continue to be successful - thanks to all who have come out to work! With volunteer help and that of Operation Purple- a military service group from Teton Science School (pictured above) - the new “Wiggle” trail connecting the Cache Creek Sidewalk to Putt Putt is now open. It offers a great beginner loop from the Cache Creek trailhead that is approximately 3 miles long.
The Greater Snow King Area trails are all open and in good shape. There are still a few problems in West Game where reroutes are needed as well as one seeping section of the Game Creek trail that users should go around.
Munger trails are all open and rideable.
Lower trails in the Teton Pass Area are open, but mid and higher elevation trails still have many sections that remain under snow, and/or have trees down yet to be removed. The Arrow Trail is nearly snow free until the corner towards the SnoTel area where drifts persist. The Ridge Trail is drying out from the Fish Creek side and offers a nice out and back. Jimmy’s Mom is in good shape for the downhill bikers, just be advised to be cautious of up hill traffic on Old Pass Road.
Teton Freedom Riders are hard at work rebuilding the Powerline Jumps. This is not finished, but TFR encourages those interested to go over and check out the progress being made.
Notes:
Please beware of wildlife and early season conditions on all trails - carry bear spray! A cat (mountain lion) was spotted on Linda’s Trail last week. Baby moose are now appearing in the lower Teton Pass Area. Please use caution as Momma Moose may not be in the mood to deal with you or your dog.
Pathways Report, July 6, 2011
All pathways are open and in great shape! Two new bike corrals were put in place last week - one at Betty Rock and one at The Wort Hotel!
The fence on Garaman, where it comes to Gregory Lane has been fixed. Parks and Rec is sweeping the system today and tomorrow. Friday they will be focusing on the line-of-sight trimming on Hwy 390.
Pathways will remain open during construction/maintenance, but users should exercise caution when passing through construction areas. Users should remember to keep their dogs under control – dogs are required on leashes within the Town of Jackson, pick up after their dogs using mutt-mitt bags, and place the used mutt-mitt bags in the trash cans. Walkers, rollers, and riders should stay to the right, allowing two-way traffic, announce their approaches from behind, and signal all intentions, including changes of direction. Finally, please remember motorized vehicles are not permitted on the pathways.